外语招生网
 外语报名咨询热线:010-51294614、51299614  ||  热点:环球雅思2010年精品课程抢鲜报
 雅思·IELTS新托福·TOEFL四六级PETS商务英语职称英语小语种翻译少儿英语GREGMAT | 其他外语考试

Will London 2012 be The Green Olympics?

作者:不详   发布时间:2010-03-15 14:44:42  来源:网络
  • 文章正文
  • 调查
  • 热评
  • 论坛

  The Winter Olympics are over and amongst the medals and trouncing the US at hockey, Vancouver was praised for hosting the “greenest Olympics ever” with LEED certified buildings, the use of recaptured gas and the construction of a hydrogen highway. However, London looks set to raise the bar even higher with plans to blow Vancouver’s achievements out of the water in 2012. The London Olympic Authority have stated that they are aiming to make London 2012 the first sustainable Olympic Games, setting a precedent for future events.
  In order to make London 2012 the greenest Olympics yet, each building and stadium is being constructed to meet specific targets. Rainwater, for example, has been collected in order to reduce the amount of potable water used in the buildings. The construction firms have a water reduction target of 40 percent, but their CO2 target is even higher.
  Through a whole host of new innovations, the Olympic Authority is aiming to cut the entire project’s carbon footprint by 50 percent. The aggregate industry has stated that they aim to source 25 percent of their materials through recycling, while cement manufacturers have said they’re looking at ‘greener’ ways to fire their plants. Even 90 percent of demolition materials used are said to be recycled.
  Everything about the project is designed to champion low-waste, low carbon emissions, and green transportation. Timber used in the construction of venues is from fully traceable legal and sustainable sources, public transport will be promoted as the best way to get around, and all energy generated will be renewable.
  As you’d expect, this desire to be cutting-edge has cost the capital. The initial budget of the Games was $3.5 billion, but that has now risen to $13.94 billion. Of course, the drive and innovation is admirable — the only question is will it be finished on time? One only has to cast their minds back to the Millennium Dome and the Wembley Stadium refurbishment to know how London projects can go disastrously over-budget and over-schedule.
  To find out more about the London 2012 Olympics, go to the Offical London 2012 website.

以下网友留言只代表网友个人观点,不代表本站观点。 立即发表评论
提交评论后,请及时刷新页面!               [回复本贴]    
用户名: 密码:
验证码: 匿名发表
外语招生最新热贴:
【责任编辑:苏婧  纠错
阅读下一篇:下面没有链接了
【育路网版权与免责声明】  
    ① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接、转贴或以其他方式复制发表时必须注明"稿件来源:育路网",违者本网将依法追究责任;
    ② 本网部分稿件来源于网络,任何单位或个人认为育路网发布的内容可能涉嫌侵犯其合法权益,应该及时向育路网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,育路网在收到上述法律文件后,将会尽快移除被控侵权内容。
外语报名咨询电话:010-51294614、51299614
外语课程分类
 
-- 大学英语---
专四专八英语四六级公共英语考研英语
-- 出国考试---
雅思托福GREGMAT
-- 职业英语---
BEC翻译职称英语金融英语托业
博思实用商务面试英语
-- 实用英语---
口语新概念外语沙龙口语梦工场口语
VIP翻译
-- 小语种----
日语法语德语韩语俄语阿拉伯语
西班牙语意大利语其它语种
热点专题·精品课程
 
外语课程搜索
课程关键词:
开课时间:
价格范围: 元 至
课程类别:
学员报名服务中心: 北京北三环西路32号恒润中心1803(交通位置图
咨询电话:北京- 010-51268840/41 传真:010-51418040 上海- 021-51567016/17
育路网-中国新锐教育社区: 北京站 | 上海站 | 郑州站| 天津站
本站法律顾问:邱清荣律师
1999-2010 育路教育版权所有| 京ICP备05012189号