首页 课程  书店 学校  题库 论坛  网校  地方分站: 北京 | 上海 | 郑州 | 天津 | 山东
报名咨询热线:010-51268840、51268841
 BEC商务英语考试网
 新闻动态  报考指南   经验交流  考试答疑区  BEC学友圈  热点课程  网络课程  热门下载
 BEC初级:真题|模拟题|辅导(听力/阅读/口语/写作) BEC中级:真题|模拟题|辅导(听力/阅读/口语/写作) BEC高级:真题|模拟题|辅导(听力/阅读/口语/写作)

2011商务英语中级考试模拟冲刺试题及答案(2)

作者:   发布时间:2011-07-20  来源:育路教育网
  • 文章正文
  • 网校课程
  • 资料下载
  • 热门话题
  • 论坛
无标题文档

  PART TWO

  Questions 8-12

  Read this memorandum.

  Choose the lest sentence from the list A-I to fill each of the blanks.

  For each blank (8-12) mark one letter (A-I) on your Answer Sheet.

  De not mark any letter twice.

  One answer has teen given as an example.

  MEMORANDUM

  To: Filma Williams ,school of Architecture

  From : Ram S. Johnson ,Physical Plant Operations

  Subject : Air-conditioning Installation Costs for East Hall.

  Date : 4.4.94

  As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in Eest Hall ...example...

  Office and Classroom installation

  Estimates were obtained from three contractors on the costs of covering the offices and classrooms ...8...The work would take about three weeks.

  Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period...9... Sheet metal work to build out lest in the classes could be done on weekends , and the overtime labour costs of about $1,500 have been included in the estimates.

  Arrangements were not made to do the office space installation on weekends `.. ... 10... ..

  Additional Installation

  Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways ,an additional $6 , 000 would be required for the equipment. .....11 ... If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ...12...

  Summary

  the total job for the building would be about $ 35, 000 if done at one time. A two-stage installation would cost about $55 ,000. I can get official bids at your request.

  Example: A

  A As you suggested, we also sought information on the additional cost of air

  conditioning in the entrance halls and stairways.

  B All these three were in the $ 20,000 to $25,000 range.

  C This later installation would cost about $20,000.

  D However, class interruption should be minimal.

  E In the same way, each of these three would take at least one month.

  F therefore ,the total cost was this $6 ,000 plus another $5,000.

  G Labour costs would be an additional S 5 ,000,bringing the total cost of the addition to $11 ,000.

  H Each faculty member could expect to have workers in the office for about one day.

  I So faculty members can continue their office work as usual.

  8. B 9. D 10. H 11. G 12. C

课程名称 老师 课时 试听 报名 学费
BEC初级精讲班 苗永金 20 试听 200元
BEC中级精讲班 谢老师 40 试听 200元
BEC高级精讲班 马老师 20 试听 200元
BEC高级习题班(考官主讲) 谭松柏 16 试听 200元
BEC写作精讲班(赠送) 王 皙 20 试听 200元(赠)
                                                                        查看更多课程>>
热门资料下载:
商务英语考试论坛热贴:
【责任编辑:育路编辑  纠错
[an error occurred while processing this directive]
外语培训咨询电话:010-51294614
课程辅导
                    
[an error occurred while processing this directive]
 考试科目辅导
                       更多>>
[an error occurred while processing this directive]