2010国际货运代理从业资格考试试题:《专业英语》第三章练习(2)

来源:来源于网络发布时间:2010-02-03

二、判断题

 1.When traders set the time for shipment in a contract, the exporter should consider whether he can get the goods ready before the shipment date and whether the ship is available if the goods are ready. ( )

  答案:对

  2. If the L/C stipulates that the expiry date is July 31st without a shipment date, then the latest shipment date is construed as July 21st. ( )

  答案:错

  3.Methods of transport is one of the terms of shipment. ( )

  答案:对

  4.The term “ first half” of a month refers to 1st to 16th . ( )

  答案:错

  5.Sometimes, the L/C only stipulates an expiry date without shipment date, which means these two dates are the same. ( )

  答案:对

  三、英汉互译

  1)UCP500 2) liner freight tariff 3) expiry date 4) ports of call 5) partial shipments 6) liner transport 7) sailing schedule 8) shipping space 9) dispatch money 10) bunker surcharge

  答案:1)《跟单信用证统一惯例》国际商会第500号出版物 2)班轮运价表  3)有效期 4)挂靠港 5)分批装运 6)班轮运输 7)船期表 8)舱位 9)速遣费 10)燃油附加费

  9.汉译英

  1)租船运输 2)交单3)违约 4)转船附加费 5)装运港 6)装运有效期 7)合同条款 8)最迟装运期 9)装运条款 10)信用证

  答案:1) shipping by chartering 2) presentation of documents 3) break contract 4) transshipment additional 5) port of loading 6) shipment date 7) terms of contract 8) the latest date for shipment 9) terms of shipment 10) letter of credit。

纠错

育路版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:育路网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为育路网发布的内容可能涉嫌侵犯其合法权益,应该及时向育路网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,育路网在收到上述法律文件后,将会尽快移除被控侵权内容。